Program Directives
- 1A Design Phase Guides
- 1B Code Requirement Guides
-
1C General Procedures
- 1C-1 Definitions of Net and Gross Areas
- 1C-2 Specification of Materials
- 1C-3 Material and Color Selections
- 1C-4 Extra Compensation Authorization
- 1C-5 Subsurface Investigation Procedures
- 1C-6 Control Testing Laboratory Services
- 1C-7 Proposing Site Representatives
- 1C-8 Project Estimating
- 1C-9 Historic Preservation
- 1C-10 Coordination with Individual Campus Standards
- 1C-11 Project Meetings and Responses to Phase Comments
- 1C-12 Survey Mapping and Utility Locating
- 1C-13 Design Delegation
-
1D General Guides
- 1D-1 Unit Prices
- 1D-2 Demolition of Structures
- 1D-3 Governing Agency Submissions
- 1D-4 Construction Site Requirements
- 1D-5 Lead Remediation
- 1D-6 Asbestos Abatement
- 1D-7 Project Sign
- 1D-8 Air Permits - NYS and EPA Permitting Requirements for Air Contamination Sources
- 1D-9 Monitoring Removal of Asbestos and Hazardous Materials During Construction
- Division 2 - Civil/Site Directives
-
Division 3 - Concrete
- 3-1 Concrete
- 3-2 (Reserved)
- Division 4 - Masonry
- Division 5 - Metals
- Division 7 -Thermal and Moisture Protection
-
Division 8 - Doors and Windows
- 8-1 Door Hardware
- 8-2 Doors and Frames
- 8-3 (Reserved)
- 8-4 Wood Windows
- 8-5 (Reserved)
- 8-6 Curtain Walls
-
Division 10 - Specialties
- 10-1(Reserved)
- 10-2(Reserved)
-
Division 11 - Equipment
- 11-1 (Reserved)
- 11-2 Classifications and Symbols / Equipment Classification
- 11-3 (Reserved)
- 11-4 (Reserved)
- 11-5 (Reserved)
-
Division 12 - Furnishings
- 12-1 (Reserved)
- 12-2 (Reserved)
- Division 14 - Conveying Systems
- Division 21 - Fire Protection
- Division 22 - Plumbing
- Division 23 - Heating Ventilation and Air Conditioning (HVAC)
- Division 26 - Electrical
- Division 27 - Communications
- Division 28 - Fire Alarm, Electronic Safety and Security